The distance that the lower roof membrane laps onto the steeper sloped roof and the need for isolation between incompatible materials.
Sloped roof to flat roof transition.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.
The water runs off the long ends that is flat roof is highest in the middle and slopes to the 40 foot sides.
There are two key details for the transition between steep and low slopes.
We need to do something where that change happens so the panels can go down and water can come off hit the lower slope and come off the roof.
I want to install a new epdm flat roof.
Epdm flat roof to sloped roof transition.
This latest project was in early december in lambeth ontario for a residential home that had an existing sloped or shingled roof that needed to tie into a ne.
I have a 12x40 rectangular flat roof that is met on all sides by a slate roof.
We are in the process of having a standing seam metal roof installed.
It turns out that our flat roof which is the roof over our 4 seasons porch and is an extension of the original house.
My truss designer has asked if i want a supplemental flat bottom chord truss to make these transitions.
In other words there will be two transitions between flat and sloped ceilings.
Here is my situation.
You ll have a steeper part of your roof turning into a lower slope so there s a steeper pitch up top and a lower pitch on the bottom.
Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
We re going to do a pitch transition or change.
We also have a stack that comes out of the flat roof that has caused leaking as well.
Has had major water damage to the roof decking and insulation that sits below the ib roof system.
I am working on finalizing my roof truss order.
I had assumed this would be how it was done a scissor truss with a flat.
Our 4 12 pitched roof transitions to a flat roof on three sides with two valleys feeding into the flat roof on the corners pls see pic we had the flat roof covered with tpo which runs at least a foot up the sloped roof on the three sides.